 PRIMARY DEAERATION CHAMBER |
 COSWORTH FI OIL TANK SECONDARY DEAERATION |
 SECONDARY DEAERATION SUB ASSEMBLY |
 SECONDARY DEAERATION WELDED TO BODY |
 PRIMARY DEAERATION CHAMBER WELDED INTO TANK BODY |
 BOTTOM BAFFLE ASSEMBLY |
 PRIMARY AND SECONDARY UNITS INSTALLED IN TANK BODY AND ASSEMBLED IN STEEL JIG |
 TANK TAKING SHAPE |
 TANK OUTER SKIN |
 OIL TANK RETURN AND FEED PORTS |
 FINISHED OIL TANK |